top of page

The design features of the project have been split into two distinct groupings: the physical system and the electronic control system. Further sub pages regarding the details of the physical as built system, control system hardware and software have been linked in the diagram below. It is also important to state that, IQ/OQs (Installation/Operation Qualifications) were utilised throughout the entire building phase in order to evaluate whether designs met the required standards and specifications. To view these IQ/OQ's please follow the download link provided here

If you would like any more details regarding the building phase of the project, please refer to our project blog which gives a day-by-day account of the various tasks undertaken to build the PV system found here

Build Phase

Build Phase 

© 2014 by Group K - Kenta Nakamura, John Ewing, Jamie McMorran, Francis Head, Laura McLean, Magnus Johnson